In order
to apply for a Building permit, you will need the
following:
-
Application
- (2)
complete sets of plans *if Commercial, need to
be signed/sealed.
- (2)
site/plot plans
-
Approved zoning permit from local jurisdiction.
*if you do not have it at the time of
application, it will be needed before issuance
of permit.
- Permit
fee (cash or check only) *at least 1/3 payment
at the time of application.
- Obtain
Floodplain Development Permit, if applicable.
- In Bath
Township, check for WPAFB Airport Fly Zone
Permit.
In order
to apply for Electrical, HVAC, Kitchen Hood, Gas
Line, Sign, etc., you will need the following:
-
Application
- (2)
complete sets of plans - *if Residential, no
plans required. Exception: Residential
Electrical Permits, if Service is 400 Amps or
higher, (2) one line drawings are required.
- Permit
fee (cash or check only) *at least 1/3 payment
at the time of application.
In order
to apply for Fire Alarm, Limited/Unlimited
Sprinkler, Suppression, Mag Locks, etc., you will
need the following:
-
Application
- (3)
complete sets of plans
- Permit
fee (cash or check only) *at least 1/3 payment
at the time of application.
*IF
APPLYING FOR ALL PERMITS AT THE SAME TIME, ONLY TWO
COMPLETE SETS OF PLANS, INCLUDING ALL OF THE ABOVE
ARE REQUIRED.
PLAN
REVIEW TURN AROUND TIME:
-
Commercial- 2-4 weeks
-
Residential- 7-10 business days.
Please note: This is an approximate
time frame. Due to workload, plan review could
take 15-20 business days.
|