|
Rates and
fees charged by the Greene County Sanitary
Engineering Department
(effective February 1, 2010)
Water rates
For the
entire Greater Greene-Little Miami Sewer
District, no exclusions:
Monthly Minimum Charge
Meter Size
0 - 1,000 Gallons
5/8”
$12.01
3/4”
$22.27
1”
$42.16
1 1/2”
$92.96
2”
$153.81
3”
$294.66
4”
$493.94
6”
$1000.05
8”
$1,599.73
Wholesale Charge
Over 1,000 gallons
monthly................... $4.11/1,000
gallons
Irrigation......................................................................................$5.14/1,000
gallons
Sewer rates (effective January 1,
2010)
a. For the entire Greater
Greene-Little Miami Sewer District
where water usage is not metered by Greene
County
Office of Sanitary Engineering or its
approved agent.
FLAT RATE - Per Month............................................
$54.65
b.
For the entire Greater Greene-Little Miami
Sewer District
where water usage is metered by Greene
County Office
of Sanitary Engineering or its approved
agent.
Monthly Minimum Charge
Meter Size
0 - 3,000 Gallons
5/8” $21.13
3/4” $32.12
1” $53.13
1
1/2” $106.10
2”
$169.83
3”
$318.40
4”
$530.59
6”
$1061.18
8”
$1,697.86
Wholesale Charge
Over 3,000 gallons
monthly................... $6.60/1,000
gallons
All other fees
1.
Plans
review.......................................................................
$50 plus
0.1% times the approved engineer’s estimate
2. Inspection
a. Regular work
hours...................................................
$20/hour
b. Overtime work
hours.................................................
$30/hour
c. Holiday work
hours....................................................
$50/hour
B. Service Connection
1.
Domestic Service Tap-In Charge
- based on relative maximum safe operating
capacity of the water meter, per American
Water Works Association C700. For the
Greater Greene-Little Miami Sewer District
served by entirely Board of County
Commissioners owned facilities:
EFFECTIVE 1 JANUARY 2009
WATER AND SEWER TAP-IN FEES
GREENE COUNTY SANITARY ENGINEERING
5/8” Meter
$3,500
Water
$ 240
Meter
$3,500
Sewer
$7,240
Total
3/4” Meter
$5,250
Water
$ 270
Meter
$5,250
Sewer
$10,770
Total
1” Meter
$8,750
Water
$ 300
Meter
$8,750
Sewer
$17,800
Total
1 ½” Meter
$1,750
Water
$ 460
Meter
$17,500
Sewer
$35,460
Total
2” Meter
$28,000
Water
$ 560
Meter
$28,000
Sewer
$56,560
Total
3” Meter
$56,000
Water
$ 810
Meter
$56,000
Sewer
$112,810
Total
4” Meter
$87,500
Water
$ 2,610
Meter
$87,500
Sewer
$177,110
Total
6” Meter
$175,000
Water
$ 4,610
Meter
$175,000
Sewer
$354,610
Total
8” Meter
$280,000
Water
$ 5,110
Meter
$280,000
Sewer
$565,110
Total
Tap-in fees for the Greater Greene-Little
Miami Sewer District served by the County
under an agreement with a person, firm or
corporation that specifies a greater tap-in
fee than that charged for entirely Board of
County Commissioners owned facilities, shall
be the tap-in fee established under said
agreement.
2. Irrigation Meter Tap-In Fee -
based on relative maximum carrying capacity
of the meter, per American Water Works
Association Standard C700. For the
Greater Greene-Little Miami Sewer District:
Meter Size
Tap-In Fee
5/8”
$460
3/4”
$870
1”
$1,300
1 1/2”
$2,460
2”
$3,760
3”
$6,810
4”
$12,610
6”
$24,610
8”
$37,110
Fees for meters larger than eight inches
(8”) in diameter may be obtained from the
Sanitary Engineer upon written request.
3. Fire Protection Line
Tap-In Fee
- based on relative carrying capacity of the
size line for the same velocity of flow.
For the Greater Greene-Little Miami Sewer
District:
Line Size
Tap-In Fee
2”
$200
3”
$580
4”
$1,260
6”
$3,680
8”
$7,880
10”
$14,240
Fees for lines greater than ten inches (10”)
in diameter may be obtained from the
Sanitary Engineer upon written request.
4. Equalization Charge
Certain County constructed water projects
require that when a property abutting the
water line is split or subdivided, each
newly created lot or parcel pay the
equivalent of the tentative assessment for
the project in cash with the tap-in fee at
the time of obtaining the tap-in permit,
before making connection to the water
system. The equalization charge (if
any) for a particular property may be
obtained upon request from the Greene County
Office of Sanitary Engineering.
5. Connection Charge
Meter Size
Connection Charge
5/8”
$240
3/4”
$270
1”
$300
1 1/2”
$460
2”
$560
For any meters larger than two inches (2”)
and for special meters, the connection
charge will be based on the cost of the
meter plus labor costs for the installation.
6. Other Expenses - All
other costs involved in a connection
described in Items 1 and 5 above, including
the installation of the service line,
service valves, meter yokes, construction of
meter pits, etc., shall be paid by the
applicant directly to any person or business
registered by the County to perform such
service.
7. An
administrative processing fee of $75.00 will
be charged on all requested refunds for
permits issued pursuant to items 1 through 5
above.
2. Irrigation Service Rate
Irrigation
Service
Rate................................. $5.14/1,000
gallons
3. Other Expenses
a. Turn-off at meter
pit.....................................................
$25.00
b. Turn-off at
main.............................................................COST
c. Meter re-read (if original
reading correct)............….$10.00
d. Meter test (if meter
accurate)......................................
$5.00
e. Damaged meter
repair................................................
COST
f. Damaged fire
hydrant...................................................
COST
g. Hose bib meter water
charges °
1. Use fee for hose bib meter:
a. Swimming
Pools...................................
$10.00/use
Late
Return..............................................
$5.00/day
b.
Irrigation...............................................
$50.00/year
Late
Return..............................................
$5.00/day
· Water
used shall be charged at the Irrigation
Service Rate in accordance with the Schedule
of Water Rates currently in effect.
4. Deduct
Meter Service Rate
– shall be charged at the Irrigation Service
Rate in accordance with the Schedule of
Water Rates currently in effect (for single
family residential customers only).
SANITARY SEWERAGE AND SEWAGE TREATMENT
FACILITIES
For the entire Greater Greene-Little Miami
Sewer District where water usage does not
constitute the only discharge to the
sanitary sewer and/or all water usage is not
metered by Greene County Office of Sanitary
Engineering or its approved agent,
connection charges will be determined as
follows:
(i) The Sanitary Engineer shall
estimate the peak flow to be contributed by
the proposed connection, based upon the Ohio
E.P.A. “Sewage Flow Guide” from Water
Supply, Sewerage and Sewage Treatment
for Public Buildings in Ohio, (as amended).
(ii) The Sanitary Engineer shall
determine the water meter size necessary for
that peak flow.
(iii) Connection charges will then be
established in accordance with Section on connection fees
above.
Connection
charges for the Greater Greene-Little Miami
Sewer District served by the County under an
agreement
with a person, firm or corporation that
specifies a greater
connection charge than that charged for
entirely Board of
County Commissioner owned facilities, shall
be the
connection charge established under said
agreement.
Equalization Charge
Certain County constructed sewerage projects
require that when a property abutting the
sewerage is split or subdivided, each newly
created lot or parcel pay the equivalent of
the tentative assessment for the project in
cash with the connection charge at the time
of obtaining the tap-in permit, before
making connection to the sewerage system.
The equalization charge (if any) for a
particular property may be obtained upon
request from the Greene County Office of
Sanitary Engineering.
Other Expenses - All
other costs involved in a connection
described in Item l above, particularly the
construction of the service line from the
County sewer to the house or building, shall
be paid by the applicant directly to any
person or business registered by the County
to perform such service.
Irrigation Credit
A special water and sewer rate structure for
single family residential domestic service
accounts will be used during the two (2)
summer billing quarters in determining water
and sewer charges to account for water used
for outside or other irrigation purposes and
not returned to the sanitary sewerage
system. The special rate will
eliminate sewer charges for all domestic
residential service water in excess of
one-hundred twenty-five percent (125%)
of the metered amount used during the
previous two (2) winter billing quarters.
In the event that a complete winter season
average cannot be established, the winter
usage will be based on 24,000 gallons x
125%, which equals 30,000 gallons each
quarter (60,000 gallons per winter season).
Water usage in excess of one-hundred
and twenty-five percent (125%) of the
metered amount used during the previous two
(2) winter billing quarters will be charged
at the Irrigation Service Rate in
accordance with the Schedule of Water Rates
currently in effect. In the event that
a complete winter season average cannot be
established, the winter usage will be based
on 24,000 gallons x 125%, which equals
30,000 gallons each quarter (60,000 gallons
per winter season).
METER READ SUMMER BILLING PERIOD
WINTER BILLING PERIOD
April
April – September
October – March
May
May – October
November – April
June
June – November
December - May
EXAMPLE:
November Bill
Winter – Usage from meter reading date
in October to meter reading date in April.
Summer – Usage from meter reading date
in April to meter reading date in October.
Total Summer usage = 102,000
gallons. Total Winter usage = 42,000
gallons
42,000 gallons x 125% = 53,000 gallons.
Usage over this amount will not be
charged for sewer. The water charge
over this amount will be computed at the
irrigation rate. 102,000 gallons –
53,000 gallons = 49,000 gallons.
Adjust for this amount.
Sewer
49,000 gallons x $6.60 per 1,000 gallons =
$323.40
Domestic Water
49,000 gallons x $4.11 per 1,000 gallons =
$201.39
Irrigation Water
49,000 gallons x $5.14 per 1,000 gallons =
$251.86
Irrigation Water
$251.86
Water
-201.39
$ 50.47 Additional charge for
water at irrigation rates.
- $323.40 Adjustment for sewer
+50.47 Additional charge for water
at irrigation rates
-
$373.87 Net Adjustment (Credit) to
Customer
MISCELLANEOUS CHARGES RELATING TO WATERWORKS
FACILITIES, SANITARY SEWERS AND WASTEWATER
TREATMENT FACILITIES AND GARBAGE AND REFUSE
DISPOSAL (LANDFILL)
A. Regulations and
Specifications..............................................
$30.00
B. Bad check
charge....................................................................
$20.00
C. Lien list preparation
charge....................................................
$10.00
D. Inspection
fees.......................................................................
$20/hour
E. Overtime inspection fee (in
excess of regular working
hours)..............................................................................
$30/hour
F. Inspection fee on Holidays
recognized by the Board of Greene
County
Commissioners................................................
$50/hour
G. Copies of maps, correspondence,
etc.
1. 8-1/2” x 11” or
8-1/2” x 14”
copies.................................
$0.25
2. 8-1/2” x 14”
copies of “as-built” construction drawing
“slicks”.......................................................................
$0.50
3. 22” or 24” x 36”
or greater “blueline”
copies................. $4.00
4. AutoCADD 2000 or
2002 disk (customer to furnish
disk[s]).............................$5.00/24”
x 36 sheet or drawing file
5. a.
General plan map (black and
white)........................ $5.00
b. General plan map
(color).......................................
$10.00
H. Equipment Rental
1.
1 1/2” A.C.
Tap....................................................
$85.00 per tap
2.
1 1/2” P.V.C.
Tap................................................
$75.00 per tap
3.
10 Ton
Dump.....................................
$75.00 per Hour + Labor
4.
2 Ton
Dump........................................
$55.00 per Hour + Labor
5.
2” A.C.
Tap........................................................
$115.00 per tap
6.
2” D.I.
Tap..........................................................
$110.00 per tap
7.
2” Diaphragm Pump..........................
$45.00 per Hour + Labor
8.
2” P.V.C.
Tap......................................................
$85.00 per tap
9.
250 AMP
Welder.............................................
$75.00 per Hour
10.
3” Diaphragm Pump.......................
$50.00 per Hour + Labor
11.
3” Midland Pump.............................
$65.00 per Hour + Labor
12.
3/4” and 1” P.V.C.
Tap.....................................
$65.00 per tap
13.
3/4” and 1” D.I.
Tap...........................................
$65.00 per tap
14.
3/4” and 1” AC
Tap...........................................
$70.00 per tap
15.
300 AMP Welder..........................
$100.00 per Hour + Labor
16.
4”, 6”, and 8” Taps, other
systems....................................$550.00
+ Labor + Mileage
17.
4” Tap County
System..................................
$500.00 + Labor
18.
6” Tap County
System..................................
$500.00 + Labor
19.
8” Tap County
System..................................
$500.00 + Labor
20.
Backhoe.........................................
$125.00 per Hour + Labor
21.
Equipment..........................................................................
Rate
22.
Flo-tote...............................................
$75.00 per day + Labor
23.
Inserta Valves 6” and 8”.............
$750.00 + Labor + Mileage
24.
Jet-Vac.........................................................
$125.00 per Hour
25.
Large
Generator..........................................
$125.00 per Hour
26.
Manual
Rodder................................
$55.00 per Hour + Labor
27.
Meter
Testing................................................
$25.00 per meter
28.
Pipe
Pusher...................................
$125.00 per Hour + Labor
29.
Pipe
Saw..........................................
$40.00 per Hour + Labor
30.
Portable Air Compressor............. $100.00
per Hour + Labor
31.
Power Coil Rodder.........................
$50.00 per Hour + Labor
32.
Sheeler Pipe
Cutter.......................................
$25.00 per Hour
33.
Small
Generator..............................
$65.00 per Hour + Labor
34.
TV Camera (Lateral)....... $100.00 per Hr +
Labor + Mileage
35.
TV Camera (Mainline).... $150.00 per Hr +
Labor + Mileage
36.
Underground Sonar........ $150.00 per Hr +
Labor + Mileage
Permit purchasers should continue to inquire
about equalization fees on all properties
where the water and sewer system was County
installed. |