Road Closures (Current and Future) - Scheduled closings are subject to change due to weather conditions.  

2020 Microsurfacing Program is complete. 

Microsurfacing Program to Begin - The Greene County Engineer’s Office announces that Strawser Construction Inc will be microsurfacing the following roads beginning, Friday, July 10, 2020 thru Tuesday, July 14, 2020, weather and equipment permitting. 

Road To / From Date
South Charleston Rd Jamestown Corp Limits to Selma Jamestown Rd Fri, July 10 and Sat July 11

Polecat Rd Yellow Springs Cop Limits to County Line Mon, July 13, and Tues July 14


These roads will be under construction between the hours of 7 am and 5 pm each day. Emergency traffic and local traffic only will be maintained using flaggers (no thru traffic). Travelers can expect delays and we encourage you to use alternative routes.  When traveling thru these areas, we ask that you please slow down and use caution as there are unmarked no passing zones.

Microsurfacing is a protective seal coat which extends the life of pavement. It is a thin, tough layer of asphalt emulsion blended with finely crushed stone for traction. This is a cost-effective method to renew the road surface and seal minor cracks and other irregularities.
This preventive maintenance process protects the pavement from moisture penetration and oxidation.

We appreciate your patience and cooperation during the microsurfacing program and apologize for any inconvenience.
MicroSurface (jpg)

Opened as of June 25

Hussey Road to Close for Culvert Replacement

Hussey Road, in Jefferson Township, will be closed between Port William Road and East Beal Road.  The closure is to replace a culvert and will be closed for two weeks starting Monday, June 22, 2020,  weather and equipment permitting.  The detour will be Port William Road to E. Beal Road. We appreciate your patience and cooperation during this replacement project and apologize for any inconvenience.


Hussey Rd 06 2020 (JPG)

Opened as of June 18

Hussey Road to Close for Culvert Replacement
 

Hussey Road, in Jefferson Township, will be closed between Mt. Carmel Road and Cline Road.  The closure is to replace a culvert and will be closed for two weeks starting Monday, June 15, 2020,  weather and equipment permitting. The detour will be Mt. Carmel Road to Sheridan Road to Hite Road.

We appreciate your patience and cooperation during this replacement project and apologize for any inconvenience.

Hussey Rd 05 2020 (JPG)
Opened as of June 12

Old US Route 35 Road Construction  


Old U.S. Route 35 E, in Cedarville Township/New Jasper Township, will be closed between N. Ballard Road and Wolford Road.  The closure is to replace a culvert and will be closed for two weeks starting Monday, June 1, 2020,  weather and equipment permitting. The detour will be Stringtown Road to Jasper Road to New Jasper Station.  We appreciate your patience and cooperation during this replacement project and apologize for any inconvenience.

Old US 35 Closure Map 2

Bridge Construction Update

For Immediate Release: April 13, 2020

Dayton Yellow Springs Road Bridge Rehabilitation to Begin April 13, 2020

Greene County and the City of Fairborn, in conjunction with the Ohio Public Works Commission, is rehabilitating the Dayton Yellow Springs Road bridge in Fairborn between Commerce Center Blvd. and Gateway Dr.  Construction is beginning, Monday, April 13, 2020, and is expected to last 3 months, weather and equipment permitting.  Traffic will be maintained for the duration of the project, but will be reduced to one lane each direction.

The existing bridge carries approximately 18,000 vehicles a day and was constructed in 1974.  This project will rehabilitate the existing structure and includes the removal and replacement of 4’ of each side of the existing deck, construction of an 8’ sidewalk on the north side of the bridge, replacement of the existing bridge railing and overlay of the existing deck.  This project also includes full depth pavement reconstruction and paving. 

Bids were taken for the project in 2019 and the contract was awarded to R.B. Jergens Construction, Inc of Vandalia.  Local Transportation Improvement Program grant funds were secured for the rehabilitation of this bridge thru the Ohio Public Works Commission and the local share is being funded by the City of Fairborn and the Greene County Engineer’s Office.

We appreciate your patience and cooperation during the construction and apologize for any inconvenience.   

Dayton-Yellow Springs Construction (JPG)

Notices  